Dennis
------
management of the connecting the f/e of the builder to the b/e. Daryl has access to the gerrit project. Draft of a content manager a module that allows us to create components, reads schema and sets up REST endpoints. Starting an asset manager, some rework on file storage interface and the file storage plugin.
Code uploaded today, definitely tomorrow - Baby due on the 12th. Rob is picking up the code and Dennis is writing documentation and ready to handle enquiries.
Brian
------
getting up to speed on backbone, login and dashboard working Issues with the persistence. Single Page APP
Kevin
-----
Backbone up and running, working on the dashboard getting searching and filtering working, session persistence. Binding to dummy objects.
Daryl
-----
Finished sprint where most of the core component are done, missing some components, getting to a point where there is a developer guide. Pages are rendering out.
Have a look at community posting - use slugs or ID's
Next steps are creating components.
Sven
----
- Concept document is complete, design stream need to review.
- Sprint and resources, progress is not as fast as we'd like
- We can get 15 extra days (maybe 10 at most)
Design stream
- how can we get the design stream working well? Important to have an overall shared vision, talked through the AT concept and vision document, it's now on gihub.
- Agreed the way of working, need a concept document and a way of working
- Get the MVP over the next 2-3 weeks?
Admin side, going for an award pitch at the learning and technologies awards. Internal Framework has pick up an award in Australia/NZ.
Workshop
--------
Have a Face2Face, components spec and continuing work, need to coordinate dates in the diary
- 4th/5th December
- 11th/12th December
- 17th/18th/19th December
Brighton.
Developer swap
--------------
Get the learingpool guys on helping out finishing the framework. Then switch over to the Authoring Tool.
Make Daryl available to get people up to speed.
Thanks for posting these, Mark.
One small correction re resources: We can get 15 extra days (maybe 10 at least)
Regarding workshops, the 4th and 5th are now out as Daryl is travelling to Derry for the 'developer swap' (i.e. everyone focusing on the framework to complete this before Learning Technologies).
Is there a preference on the workshop dates emerging?
Sven